The automaker said on Thursday it will now knock the Windsor Assembly Plant down to a single shift at the end of June 2022 as opposed to the original plan, which called for an end to the second shift in “early spring.”
The automaker said on Thursday it will now knock the Windsor Assembly Plant down to a single shift at the end of June 2022 as opposed to the original plan, which called for an end to the second shift in “early spring.”